High-Speed Cutting: fm 8 Maximizes Throughput

GLEICH Aluminium GmbH has replaced an existing panel cutting saw at its Kaltenkirchen site with the new fm 8 from IMA Schelling. The custom system solution convinced decision-makers in the selection process with its short throughput times and integrated pre-equipment for further automation. The demanding replacement was successfully completed within just three weeks during ongoing operations.

In a highly competitive global market, this long-established company with 150 employees produces around 20,000 tons of high-tech aluminum per year. The precise cutting of aluminum plates weighing up to two tons requires an optimal interplay of robust mechanics, tool technology, and digital control. The fm 8 from IMA Schelling combines these technological demands with high cost-effectiveness.

Purchase Decision: Shorter Throughput Processes


“That was really a last-minute decision,” recalls GLEICH Managing Director Sebastian Ricken. While the pure performance parameters of the competitors were very close, constructive details and the optimal placement of components tipped the scales in favor of the fm 8.

Ricken emphasizes the decisive practical advantage of IMA Schelling’s concept: “I decided based on the details. The way the system now stands in the hall and how the individual components are arranged delivers the shortest possible throughput processes. And that was the difference: the combination of the technical design of the entire system and the price.”

 

Efficiency: Less Waste and Energy Consumption


GLEICH Aluminium GmbH’s online business with over 10,000 customers in Germany alone forms the digital launchpad for the fm 8. As soon as orders are received in the webshop, software bundles hundreds of orders with the same material thickness. The system calculates the optimal pattern for the aluminum plate before the first cut, reducing the scrap rate to under 10%. This data flows directly to the machine, while fully automatic robots sort and assign the mixed parts back to the individual customer orders after cutting.

The overall system is perfectly prepared for further automation steps. Dieter Zucalli, Product Manager Precision at IMA Schelling, adds regarding the digital workflow: “Thanks to a patented installation situation, our integrated labeling solution enables dynamic marking of the workpieces in parallel with the loading and cutting process, completely without time loss.” Managing Director Ricken is certain: “With this saw, we are future-proof.”

Cycle Time: Seconds Decide Margins


At the same time, the saw’s modern drive technology significantly reduces manufacturing costs per kilogram – a decisive lever given the high weekly energy demand. Sebastian Ricken: “We can measure energy consumption on every kilogram produced. Resource conservation and efficiency are daily topics here.” And with up to 4,500 cuts per day, every second saved by the saw immediately adds up to a tangible gain.

“If the question is: ‘What requirements must a saw meet?’ then it has to be fast,” Sebastian Ricken states clearly. In the aluminum market, calculations are based on the smallest profit margins, so every moment counts in production. The Managing Director explains: “We operate in an area where we have to calculate margins in cents per kilogram.” He emphasizes: “If you save just two seconds per cut, that adds up to an enormous amount at the end of the day given the volume.” The fm 8’s high cutting rate reduces processing time per panel and ensures profitability in high-volume production.

Service Life: 30 Kilometers per Saw Blade


The coordination between the fm 8 and the tool technology enables a service life of 30 kilometers per saw blade, ensuring a fast return on investment. This optimizes material utilization, reduces tool costs, and increases the system’s profitability well beyond the planned service life.

“We achieve results like these 30 kilometers in combination with the saw and this saw blade. We can only do it this way,” confirms Ricken. For the company, a commercial logic also applies here that presupposes high quality. Ricken: “The machine must last as long as possible so that it continues to generate revenue for us even after depreciation.”

Design Advantage: Same Performance with Smaller Footprint


A central advantage of the fm 8 is its compact design with full drive power. The well-thought-out machine design resolves the classic hall conflict between limited floor space and full performance. Sebastian Ricken describes the situation in practice: “The entire machine body has become much slimmer. We need less space, but the operator can still easily reach everywhere he needs to.” In addition, IMA Schelling has made the new design more ergonomic and involved employees in the design process. “Since we already have IMA Schelling products in use, there is simply a high recognition value,” says Ricken. This also simplifies onboarding and operation.

“Because it is a compact machine, we can also use thinner saw blades. This leads to less waste and better material utilization,” explains Dieter Zucalli. He also highlights another technical feature: “Our divided pressure beam is a real unique selling point. We are the only ones who can directly extract chips both in front of and behind the plate up to around 99.5%. Manual cleaning before the separating cut is eliminated, which maximizes process reliability and minimizes secondary times.”

Project Implementation: “Open-Heart Surgery”


How do you manage such a demanding replacement at full customer capacity without stopping production? With meticulous preparation: A complete pre-assembly and functional test of the large system at the IMA Schelling factory significantly minimized the risk of downtime in Kaltenkirchen. The machine replacement at GLEICH also had a human component. “You could tell,” says Managing Director Sebastian Ricken, “that everyone affected was excited and tense.” The employees even said goodbye to their faithful predecessor machine with a specially composed farewell song. “I learned on that one when I started,” recalls GLEICH employee Dominik Prangenberg. “After years of maintenance, the joy of a new machine outweighs everything. But I still shed a little tear.”

With precise planning and smooth collaboration, the project was completed in record time. “For us, this was an open-heart surgery because we did it during full capacity,” Ricken explains. The replacement of the existing system also had another personal touch: Today’s Product Manager at IMA Schelling, Dieter Zucalli, had helped install the very machine that was replaced more than 20 years ago as a young technician. Sebastian Ricken summarizes: “Within three weeks, 95% was done. In a project like this, everyone has to know what they need to do. If you just meet as customer and supplier, the project will definitely take twice as long. But if you approach each other as partners and clearly divide the tasks, it goes relatively quickly.” Just as it did here.